Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Cedar shingle roof installation guide.
How to install a cedar shingle roof on a garden shed step 1.
Cover the roof with roofing felt.
The jb western red cedar shingles from marley are a lightweight roofing and cladding solution with a high degree of natural thermal insulation.
Return to all blogs.
Cedar shingle application cedar shake application.
Secure it to the.
Nail a shingle at the end of each wall with the proper overhang and snap a chalk line to serve as a guide for the row.
Using this chalk line method extend the first row around the entire shed.
Lap rows of 36 inch wide felt using the provided lap lines as guides.
This document will help you with the installation of your cedar shake and shingle roofs.
Click on the below links to view the full application instructions for.
Looking for a dealer in your area.
To ensure you are reading the latest edition of the roof manual please contact our office.
As with the roofing shingles make sure to leave a gap of 1 8 to 1 4 between each shingle to allow for expansion.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Use a hammer stapler to fasten it down applying a staple every 12 to 14.
Check the felt paper.
On the left side of the page in the blue section under the heading supporting documents you will find our care maintenance brochure or click here for more information.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
The shingles shall be spaced 6mm apart and be nailed or stapled twice the nails staples should be fixed 19mm in from the edge and 38mm above the butt of the course above.
Shake shingle roof application instructions feb 10 2017.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
A guide to installing cedar shingles.
Flashing intercepts and directs the flow of water away from the building to designed drainage paths.